
11
04
INSTALLATION PROCESS
WS-905 、 WS-906
STEP 1
1.Assembly of tray
If the ground is not smooth,please adjust
the nail under the tray to keep the
balance of the tray and ground.
2.Install the shower body
Follow the installation process install
the left and right side shower body,fix
it.
3. Install the shower body onto the tray
Put the shower body onto the tray,fix it.
STEP 2
M6x35
STEP 3
St4x25
Model
Top light
20W
AC12V AC12V
DC12V DC12V DC12V
KL-824
110V
25A
2650W
Ip4
Voltage
Sidelight
5W
Current
Fan
3.5W
Power
Water inlet valve
6W
protecting electrifying
Water drain valve
7W
Waterproof Grade
I
6、Technical parameter
Attention:
The machine must be fixed in the circuit which protected
by creepage protectionand should be well-connected with the
ground. Nontechnical people can not be fixed or removed at
random.
Comentarios a estos manuales