
03
INSTALLATION SKETCH
1.tap
2.drainage switch
3.control panel
4.air conditioning
5.water in
6.nozzle
7.drainage
8.pillow
9.air bubble jet
3
4
2
7
8
6
5
11
9
1.The products should be installed by technical guy who are got
the certificate or those technical who are assign by dealers. The
main power switch and electronic leakage device should be
installed.
2.The plug of electronic should be installed above the steam
generator and the length of electronic wire not less then
1800MM from the earth.
3.There are should be with main power switch for hot and cold
water pipe of steam room and the water pipe should be connect
to drainage water pipe.
4.Install the products according to the diagram of installation
When fixed the place for the products.
ILLUSTRATION OF INSTALLATION
INSTALLATION PROCESS
(STEP 1)
04
2
0
0
90
0
1250
Cold water pipe
1500
The socket
of power and
the socket
of telephone
Hot water pipe
1
50
400
The socket
of power
2250
910
1710
650
250
Comentarios a estos manuales